{"id":4025,"date":"2015-04-15T11:00:07","date_gmt":"2015-04-15T11:00:07","guid":{"rendered":"http:\/\/mirror.s-vt.net\/bauueberwachung\/"},"modified":"2026-10-26T12:17:42","modified_gmt":"2026-10-26T11:17:42","slug":"construction-supervision","status":"publish","type":"page","link":"https:\/\/www.s-vt.net\/en\/construction-supervision\/","title":{"rendered":"Construction Supervision"},"content":{"rendered":"<section class='page-content' style=''  ><section class='container'><div class='row' style=''><div class='col-md-12 ' style=''><div class='cma-wysiwyg-editor'><p class=\"svt-lead2\">Purchasing complex process plants usually involves considerable effort for the buyer. After all, the plant must deliver its full required performance after commissioning and meet all requirements \u2013 construction supervision ensures exactly that.<\/p><div class=\"svt-ptiles\"><div class=\"svt-ptile\"><i class=\"fa fa-eye\" aria-hidden=\"true\"><\/i><strong>Early inspection<\/strong><span>Quality assurance right after the contract has been awarded.<\/span><\/div><div class=\"svt-ptile\"><i class=\"fa fa-check-square-o\" aria-hidden=\"true\"><\/i><strong>FAT &amp; SAT<\/strong><span>Acceptance tests at the manufacturer and at your site.<\/span><\/div><div class=\"svt-ptile\"><i class=\"fa fa-shield\" aria-hidden=\"true\"><\/i><strong>GMP &amp; CE<\/strong><span>Verify compliance with GMP rules and CE conformity.<\/span><\/div><\/div><p>Construction supervision secures quality in the buyer\u2019s interest from the early project phases onwards. The effort is usually worthwhile, because early inspection of key components often prevents later disputes with the supplier \u2013 for example during the FAT.<\/p><p class=\"svt-knote\">Some quality defects can no longer be fully remedied once the machine is finished and being accepted. We therefore recommend construction supervision, especially for complex plants.<\/p><h2>Our construction supervision services<\/h2><div class=\"svt-kgrid svt-kgrid-3\"><div class=\"svt-kcard\"><i class=\"fa fa-pencil-square-o\" aria-hidden=\"true\"><\/i><h3>Planning &amp; manufacturing<\/h3><ul class=\"svt-klist\"><li><a href=\"\/schedule-planning\/?lang=en\">scheduling coordination<\/a> of your orders<\/li><li>drawing review (diagrams, layout plans, pipe routing) and approval in consultation with you<\/li><li>supervision of execution in line with the agreed scope and generally accepted engineering standards<\/li><li>checking compliance with GMP rules (Good Manufacturing Practice)<\/li><\/ul><\/div><div class=\"svt-kcard\"><i class=\"fa fa-check-square-o\" aria-hidden=\"true\"><\/i><h3>FAT at the manufacturer<\/h3><ul class=\"svt-klist\"><li>FAT acceptance and verification of the specified quality requirements<\/li><li>completeness check and CE declaration of conformity according to the Machinery Directive<\/li><li>test run including inspection of the safety devices, as far as possible at the manufacturer<\/li><li>FAT report and list of open points to be completed before delivery<\/li><\/ul><\/div><div class=\"svt-kcard\"><i class=\"fa fa-map-marker\" aria-hidden=\"true\"><\/i><h3>Installation &amp; SAT<\/h3><ul class=\"svt-klist\"><li>supervision and inspection of the installation<\/li><li>assistance with functional testing of plant components and the overall plant<\/li><li>monitoring the rectification of defects identified at acceptance<\/li><li>quality checks as part of <a href=\"\/design-qualification\/?lang=en\">DQ<\/a>, <a href=\"\/installation-qualification\/?lang=en\">IQ<\/a>, <a href=\"\/operational-qualification\/?lang=en\">OQ<\/a> and <a href=\"\/process-qualification\/?lang=en\">PQ<\/a><\/li><li>SAT acceptance at the final installation site<\/li><\/ul><\/div><\/div><p><strong>SEEFRIED Verfahrenstechnik GmbH<\/strong> takes care of the construction supervision of your process plant components according to the <a href=\"\/process-plants-requirement-specifications\/?lang=en\">requirement specification<\/a> \u2013 from the first drawings to acceptance at your site.<\/p><h2>Frequently Asked Questions about construction supervision<\/h2>\n<h3>Why is construction supervision at the supplier worthwhile?<\/h3>\n<p>Early inspection of key components ensures quality in the buyer\u2019s interest and avoids later disputes, e.g. at the FAT. Some defects can no longer be fully remedied once the plant is finished.<\/p>\n<h3>What does construction supervision include?<\/h3>\n<p>Among other things: schedule coordination, drawing review and approval, execution checks against the scope of services, technical rules and GMP, FAT with test run and report, installation supervision, defect tracking, quality checks within DQ, IQ, OQ, PQ and the SAT.<\/p>\n<h3>What is the difference between FAT and SAT?<\/h3>\n<p>The FAT (Factory Acceptance Test) is the acceptance at the manufacturer before delivery. The SAT (Site Acceptance Test) is the acceptance at the final installation site in your production.<\/p>\n<h3>Do you also check CE conformity and completeness?<\/h3>\n<p>Yes. We verify completeness according to the specification and the CE Declaration of Conformity according to the Machinery Directive.<\/p>\n<p><h2 class=\"svt-pcta-h\">Talk to us<\/h2><div class=\"svt-pcta svt-pcta-m\"><div class=\"svt-pcta-tx\">We are happy to advise you on construction supervision \u2013 by phone at <a href=\"tel:+494203789492\">+49 4203 789492<\/a> or by e-mail at <a href=\"mailto:in&#102;o&#64;&#115;&#45;v&#116;.&#110;e&#116;\">i&#110;fo&#64;s-vt&#46;n&#101;&#116;<\/a>.<\/div><div class=\"svt-pcta-btns\"><a class=\"svt-btn svt-btn-primary\" href=\"\/contact\/?lang=en&amp;produkt=Verfahrenstechnische%20Beratung\">Send an enquiry<\/a><a class=\"svt-btn svt-btn-ghost\" href=\"\/planning\/?lang=en\">All services<\/a><\/div><\/div><h2>More services<\/h2><div class=\"svt-sgrid\"><a class=\"svt-scard\" href=\"\/planning\/?lang=en\"><span>Planning<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/basic-engineering\/?lang=en\"><span>Basic engineering<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/design-construction-support\/?lang=en\"><span>Design &amp; construction support<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/procurement-support\/?lang=en\"><span>Procurement support<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-plants-requirement-specifications\/?lang=en\"><span>Requirement specifications for process plants<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/schedule-planning\/?lang=en\"><span>Schedule planning &amp; monitoring<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/design-qualification\/?lang=en\"><span>DQ \u2013 Design qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/installation-qualification\/?lang=en\"><span>IQ \u2013 Installation qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/operational-qualification\/?lang=en\"><span>OQ \u2013 Operational qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-qualification\/?lang=en\"><span>PQ \u2013 Process qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-optimisation\/?lang=en\"><span>Process optimisation<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><\/div><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Service\",\"name\":\"Construction supervision of process plants\",\"description\":\"Construction supervision at the supplier according to the requirement specification: drawing review, GMP execution checks, FAT, installation supervision, defect tracking and SAT.\",\"url\":\"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en\",\"provider\":{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.s-vt.net\/#seefried\",\"name\":\"SEEFRIED Verfahrenstechnik GmbH\",\"url\":\"https:\/\/www.s-vt.net\/\",\"telephone\":\"+49 4203 789492\"},\"areaServed\":\"Worldwide\"},{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Why is construction supervision at the supplier worthwhile?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Early inspection of key components ensures quality in the buyer\u2019s interest and avoids later disputes, e.g. at the FAT. Some defects can no longer be fully remedied once the plant is finished.\"}},{\"@type\":\"Question\",\"name\":\"What does construction supervision include?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Among other things: schedule coordination, drawing review and approval, execution checks against the scope of services, technical rules and GMP, FAT with test run and report, installation supervision, defect tracking, quality checks within DQ, IQ, OQ, PQ and the SAT.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between FAT and SAT?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The FAT (Factory Acceptance Test) is the acceptance at the manufacturer before delivery. The SAT (Site Acceptance Test) is the acceptance at the final installation site in your production.\"}},{\"@type\":\"Question\",\"name\":\"Do you also check CE conformity and completeness?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. We verify completeness according to the specification and the CE Declaration of Conformity according to the Machinery Directive.\"}}]}]}<\/script><\/div><\/div><\/div><\/section><\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"class_list":["post-4025","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Supervision of Process Plants: FAT, SAT &amp; GMP<\/title>\n<meta name=\"description\" content=\"Construction supervision of process plants: drawing review, GMP checks, FAT at the manufacturer, installation, defect tracking and SAT.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Supervision of Process Plants: FAT, SAT &amp; GMP\" \/>\n<meta property=\"og:description\" content=\"Construction supervision of process plants: drawing review, GMP checks, FAT at the manufacturer, installation, defect tracking and SAT.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en\" \/>\n<meta property=\"og:site_name\" content=\"SEEFRIED Verfahrenstechnik GmbH\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T11:17:42+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/construction-supervision\\\/?lang=en\",\"url\":\"https:\\\/\\\/www.s-vt.net\\\/construction-supervision\\\/?lang=en\",\"name\":\"Construction Supervision of Process Plants: FAT, SAT & GMP\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/#website\"},\"datePublished\":\"2015-04-15T11:00:07+00:00\",\"dateModified\":\"2026-10-26T11:17:42+00:00\",\"description\":\"Construction supervision of process plants: drawing review, GMP checks, FAT at the manufacturer, installation, defect tracking and SAT.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/construction-supervision\\\/?lang=en#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.s-vt.net\\\/construction-supervision\\\/?lang=en\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/construction-supervision\\\/?lang=en#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.s-vt.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Supervision\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/#website\",\"url\":\"https:\\\/\\\/www.s-vt.net\\\/\",\"name\":\"SEEFRIED Verfahrenstechnik GmbH\",\"description\":\"Misch- und Verfahrenstechnik von Experten\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.s-vt.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Supervision of Process Plants: FAT, SAT & GMP","description":"Construction supervision of process plants: drawing review, GMP checks, FAT at the manufacturer, installation, defect tracking and SAT.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en","og_locale":"en_US","og_type":"article","og_title":"Construction Supervision of Process Plants: FAT, SAT & GMP","og_description":"Construction supervision of process plants: drawing review, GMP checks, FAT at the manufacturer, installation, defect tracking and SAT.","og_url":"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en","og_site_name":"SEEFRIED Verfahrenstechnik GmbH","article_modified_time":"2026-10-26T11:17:42+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en","url":"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en","name":"Construction Supervision of Process Plants: FAT, SAT & GMP","isPartOf":{"@id":"https:\/\/www.s-vt.net\/#website"},"datePublished":"2015-04-15T11:00:07+00:00","dateModified":"2026-10-26T11:17:42+00:00","description":"Construction supervision of process plants: drawing review, GMP checks, FAT at the manufacturer, installation, defect tracking and SAT.","breadcrumb":{"@id":"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.s-vt.net\/construction-supervision\/?lang=en"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.s-vt.net\/construction-supervision\/?lang=en#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.s-vt.net\/en\/"},{"@type":"ListItem","position":2,"name":"Construction Supervision"}]},{"@type":"WebSite","@id":"https:\/\/www.s-vt.net\/#website","url":"https:\/\/www.s-vt.net\/","name":"SEEFRIED Verfahrenstechnik GmbH","description":"Misch- und Verfahrenstechnik von Experten","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.s-vt.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/comments?post=4025"}],"version-history":[{"count":4,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4025\/revisions"}],"predecessor-version":[{"id":5859,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4025\/revisions\/5859"}],"wp:attachment":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/media?parent=4025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}