{"id":4031,"date":"2015-04-08T13:06:32","date_gmt":"2015-04-08T13:06:32","guid":{"rendered":"http:\/\/mirror.s-vt.net\/iq_installationsqualifizierung\/"},"modified":"2026-10-26T12:29:18","modified_gmt":"2026-10-26T11:29:18","slug":"installation-qualification","status":"publish","type":"page","link":"https:\/\/www.s-vt.net\/en\/installation-qualification\/","title":{"rendered":"IQ &#8211; Installation Qualification"},"content":{"rendered":"<section class='page-content' style=''  ><section class='container'><div class='row' style=''><div class='col-md-12 ' style=''><div class='cma-wysiwyg-editor'><p class=\"svt-lead2\">Installation qualification (IQ) is the documented proof that facilities, systems and plants, as installed or modified, comply with the approved design and the manufacturer\u2019s recommendations.<\/p><div class=\"svt-ptiles\"><div class=\"svt-ptile\"><i class=\"fa fa-check-square-o\" aria-hidden=\"true\"><\/i><strong>Completeness<\/strong><span>Check whether all installations of the system are complete.<\/span><\/div><div class=\"svt-ptile\"><i class=\"fa fa-files-o\" aria-hidden=\"true\"><\/i><strong>Comparison with the DQ<\/strong><span>Drawings, diagrams, plans and parts lists against the approved design.<\/span><\/div><div class=\"svt-ptile\"><i class=\"fa fa-file-text-o\" aria-hidden=\"true\"><\/i><strong>Documented compliance<\/strong><span>Traceable documentation for GMP qualification.<\/span><\/div><\/div><h2>Definitions of installation qualification<\/h2><div class=\"svt-kgrid svt-kgrid-2\"><div class=\"svt-kcard\"><i class=\"fa fa-book\" aria-hidden=\"true\"><\/i><h3>Aide Memoire GMP<\/h3><p>\u201cDocumented proof that the facilities, systems and plants, as installed or modified, comply with the approved design and the manufacturer\u2019s recommendations.\u201d<\/p><\/div><div class=\"svt-kcard\"><i class=\"fa fa-book\" aria-hidden=\"true\"><\/i><h3>EU GMP Guide, Annex 15<\/h3><p>\u201cThe documented verification that the facilities, systems and equipment, as installed or modified, comply with the approved design and the manufacturer\u2019s recommendations.\u201d<\/p><\/div><\/div><h2>How the IQ check works<\/h2><ol class=\"svt-steps\"><li><span class=\"svt-step-n\">1<\/span><strong>Installation status<\/strong><span class=\"svt-step-tx\">The basis is the status of the system\u2019s installations and their completeness.<\/span><\/li><li><span class=\"svt-step-n\">2<\/span><strong>Completeness check<\/strong><span class=\"svt-step-tx\">Comparison with the <a href=\"\/design-qualification\/?lang=en\">DQ design<\/a>, drawings, diagrams, plans, parts lists and the <a href=\"\/process-plants-requirement-specifications\/?lang=en\">requirement<\/a> and functional specifications.<\/span><\/li><li><span class=\"svt-step-n\">3<\/span><strong>Comparison with the system<\/strong><span class=\"svt-step-tx\">The test results are compared with the approved system.<\/span><\/li><li><span class=\"svt-step-n\">4<\/span><strong>Documentation<\/strong><span class=\"svt-step-tx\">Compliance with the DQ documents is documented.<\/span><\/li><\/ol><h2>The qualification process at a glance<\/h2><ol class=\"svt-steps\"><li><span class=\"svt-step-n\">1<\/span><strong>RA \u2013 Risk analysis<\/strong><span class=\"svt-step-tx\">Identify and assess risks before the design is fixed.<\/span><\/li><li><span class=\"svt-step-n\">2<\/span><strong><a href=\"\/design-qualification\/?lang=en\">DQ \u2013 Design qualification<\/a><\/strong><span class=\"svt-step-tx\">Proof that the design is suitable for the intended purpose.<\/span><\/li><li><span class=\"svt-step-n\">3<\/span><strong>IQ \u2013 Installation qualification (this page)<\/strong><span class=\"svt-step-tx\">Verification of the installation against the order documents.<\/span><\/li><li><span class=\"svt-step-n\">4<\/span><strong><a href=\"\/operational-qualification\/?lang=en\">OQ \u2013 Operational qualification<\/a><\/strong><span class=\"svt-step-tx\">Verification of the intended functionality.<\/span><\/li><li><span class=\"svt-step-n\">5<\/span><strong><a href=\"\/process-qualification\/?lang=en\">PQ \u2013 Performance qualification<\/a><\/strong><span class=\"svt-step-tx\">Proof of the required performance in operation.<\/span><\/li><\/ol><div class=\"svt-pcta-btns\"><a class=\"svt-btn svt-btn-ghost\" style=\"flex:0 0 auto\" href=\"\/operational-qualification\/?lang=en\">Continue to OQ \u2013 Operational qualification <i class=\"fa fa-arrow-right\" aria-hidden=\"true\"><\/i><\/a><\/div><p><strong>SEEFRIED Verfahrenstechnik GmbH<\/strong> supports you with the documentation requirements and the verification of the installation qualification.<\/p><h2>Frequently Asked Questions about installation qualification (IQ)<\/h2><h3>What is installation qualification (IQ)?<\/h3><p>IQ is the documented verification that facilities, systems and equipment, as installed or modified, comply with the approved design and the manufacturer\u2019s recommendations (EU GMP Guidelines, Annex 15).<\/p><h3>What is checked during IQ?<\/h3><p>Based on the DQ, the technical documents (drawings, diagrams, plans, parts lists) and the requirement and functional specifications, the installation is checked for completeness and compared with the approved system.<\/p><h3>What is the result of the IQ?<\/h3><p>Documentation that the installed plant complies with the DQ documents. It is the prerequisite for the subsequent operational qualification (OQ).<\/p><h3>How do you support us?<\/h3><p>We support you with documentation requirements and the execution and review of the IQ.<\/p><h2 class=\"svt-pcta-h\">Talk to us<\/h2><div class=\"svt-pcta svt-pcta-m\"><div class=\"svt-pcta-tx\">We are happy to advise you on installation qualification \u2013 by phone at <a href=\"tel:+494203789492\">+49 4203 789492<\/a> or by e-mail at <a href=\"mailto:&#105;n&#102;&#111;&#64;s&#45;vt.net\">i&#110;&#102;o&#64;s-v&#116;.&#110;&#101;&#116;<\/a>.<\/div><div class=\"svt-pcta-btns\"><a class=\"svt-btn svt-btn-primary\" href=\"\/contact\/?lang=en&amp;produkt=Verfahrenstechnische%20Beratung\">Send an enquiry<\/a><a class=\"svt-btn svt-btn-ghost\" href=\"\/planning\/?lang=en\">All services<\/a><\/div><\/div><h2>More services<\/h2><div class=\"svt-sgrid\"><a class=\"svt-scard\" href=\"\/planning\/?lang=en\"><span>Planning<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/basic-engineering\/?lang=en\"><span>Basic engineering<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/design-construction-support\/?lang=en\"><span>Design &amp; construction support<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/procurement-support\/?lang=en\"><span>Procurement support<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-plants-requirement-specifications\/?lang=en\"><span>Requirement specifications for process plants<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/schedule-planning\/?lang=en\"><span>Schedule planning &amp; monitoring<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/construction-supervision\/?lang=en\"><span>Construction supervision<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/design-qualification\/?lang=en\"><span>DQ \u2013 Design qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/operational-qualification\/?lang=en\"><span>OQ \u2013 Operational qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-qualification\/?lang=en\"><span>PQ \u2013 Process qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-optimisation\/?lang=en\"><span>Process optimisation<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><\/div><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Service\",\"name\":\"IQ \u2013 Installation qualification\",\"description\":\"Support with documentation requirements and review of the installation qualification (IQ) for GMP plants in pharma and cosmetics.\",\"url\":\"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en\",\"provider\":{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.s-vt.net\/#seefried\",\"name\":\"SEEFRIED Verfahrenstechnik GmbH\",\"url\":\"https:\/\/www.s-vt.net\/\",\"telephone\":\"+49 4203 789492\"},\"areaServed\":\"Worldwide\"},{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is installation qualification (IQ)?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"IQ is the documented verification that facilities, systems and equipment, as installed or modified, comply with the approved design and the manufacturer\u2019s recommendations (EU GMP Guidelines, Annex 15).\"}},{\"@type\":\"Question\",\"name\":\"What is checked during IQ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Based on the DQ, the technical documents (drawings, diagrams, plans, parts lists) and the requirement and functional specifications, the installation is checked for completeness and compared with the approved system.\"}},{\"@type\":\"Question\",\"name\":\"What is the result of the IQ?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Documentation that the installed plant complies with the DQ documents. It is the prerequisite for the subsequent operational qualification (OQ).\"}},{\"@type\":\"Question\",\"name\":\"How do you support us?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"We support you with documentation requirements and the execution and review of the IQ.\"}}]}]}<\/script><\/div><\/div><\/div><\/section><\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"class_list":["post-4031","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>IQ \u2013 Installation Qualification per EU GMP Annex 15<\/title>\n<meta name=\"description\" content=\"Installation qualification (IQ) for GMP plants: check against DQ, drawings and specification \u2013 support with documentation and testing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IQ \u2013 Installation Qualification per EU GMP Annex 15\" \/>\n<meta property=\"og:description\" content=\"Installation qualification (IQ) for GMP plants: check against DQ, drawings and specification \u2013 support with documentation and testing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en\" \/>\n<meta property=\"og:site_name\" content=\"SEEFRIED Verfahrenstechnik GmbH\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T11:29:18+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/installation-qualification\\\/?lang=en\",\"url\":\"https:\\\/\\\/www.s-vt.net\\\/installation-qualification\\\/?lang=en\",\"name\":\"IQ \u2013 Installation Qualification per EU GMP Annex 15\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/#website\"},\"datePublished\":\"2015-04-08T13:06:32+00:00\",\"dateModified\":\"2026-10-26T11:29:18+00:00\",\"description\":\"Installation qualification (IQ) for GMP plants: check against DQ, drawings and specification \u2013 support with documentation and testing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/installation-qualification\\\/?lang=en#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.s-vt.net\\\/installation-qualification\\\/?lang=en\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/installation-qualification\\\/?lang=en#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.s-vt.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"IQ &#8211; Installation Qualification\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/#website\",\"url\":\"https:\\\/\\\/www.s-vt.net\\\/\",\"name\":\"SEEFRIED Verfahrenstechnik GmbH\",\"description\":\"Misch- und Verfahrenstechnik von Experten\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.s-vt.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"IQ \u2013 Installation Qualification per EU GMP Annex 15","description":"Installation qualification (IQ) for GMP plants: check against DQ, drawings and specification \u2013 support with documentation and testing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en","og_locale":"en_US","og_type":"article","og_title":"IQ \u2013 Installation Qualification per EU GMP Annex 15","og_description":"Installation qualification (IQ) for GMP plants: check against DQ, drawings and specification \u2013 support with documentation and testing.","og_url":"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en","og_site_name":"SEEFRIED Verfahrenstechnik GmbH","article_modified_time":"2026-10-26T11:29:18+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en","url":"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en","name":"IQ \u2013 Installation Qualification per EU GMP Annex 15","isPartOf":{"@id":"https:\/\/www.s-vt.net\/#website"},"datePublished":"2015-04-08T13:06:32+00:00","dateModified":"2026-10-26T11:29:18+00:00","description":"Installation qualification (IQ) for GMP plants: check against DQ, drawings and specification \u2013 support with documentation and testing.","breadcrumb":{"@id":"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.s-vt.net\/installation-qualification\/?lang=en"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.s-vt.net\/installation-qualification\/?lang=en#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.s-vt.net\/en\/"},{"@type":"ListItem","position":2,"name":"IQ &#8211; Installation Qualification"}]},{"@type":"WebSite","@id":"https:\/\/www.s-vt.net\/#website","url":"https:\/\/www.s-vt.net\/","name":"SEEFRIED Verfahrenstechnik GmbH","description":"Misch- und Verfahrenstechnik von Experten","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.s-vt.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/comments?post=4031"}],"version-history":[{"count":3,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4031\/revisions"}],"predecessor-version":[{"id":6002,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4031\/revisions\/6002"}],"wp:attachment":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/media?parent=4031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}