{"id":4035,"date":"2015-04-08T10:26:58","date_gmt":"2015-04-08T10:26:58","guid":{"rendered":"http:\/\/mirror.s-vt.net\/prozessanlagen-lastenheft\/"},"modified":"2026-10-26T12:06:15","modified_gmt":"2026-10-26T11:06:15","slug":"process-plants-requirement-specifications","status":"publish","type":"page","link":"https:\/\/www.s-vt.net\/en\/process-plants-requirement-specifications\/","title":{"rendered":"Requirement Specifications for Process Plants"},"content":{"rendered":"<section class='page-content' style=''  ><section class='container'><div class='row' style=''><div class='col-md-12 ' style=''><div class='cma-wysiwyg-editor'><p class=\"svt-lead2\">The requirement specification describes all of the client\u2019s requirements for the deliveries and services of a contractor. A clear definition of the project to be procured is the prerequisite for this document and the tender.<\/p><div class=\"svt-ptiles\"><div class=\"svt-ptile\"><i class=\"fa fa-file-text-o\" aria-hidden=\"true\"><\/i><strong>Clear requirements<\/strong><span>All requirements for delivery and service in one place.<\/span><\/div><div class=\"svt-ptile\"><i class=\"fa fa-shield\" aria-hidden=\"true\"><\/i><strong>GMP &amp; GAMP<\/strong><span>Standards and ambient conditions defined from the outset.<\/span><\/div><div class=\"svt-ptile\"><i class=\"fa fa-exchange\" aria-hidden=\"true\"><\/i><strong>Including interfaces<\/strong><span>Optionally including the associated interface descriptions.<\/span><\/div><\/div><p>First, it must be clarified which standards and ambient conditions apply to the tender \u2013 for example GAMP or GMP. To define the process engineering project clearly, we then divide it into individual phases.<\/p><h2>Phases and contents of a requirement specification<\/h2><p>The key contents of a tender include:<\/p><ol class=\"svt-steps\"><li><span class=\"svt-step-n\">1<\/span><strong>Basic parameters<\/strong><span class=\"svt-step-tx\">Definition of the basic parameters in the preliminary project (planning phase 1).<\/span><\/li><li><span class=\"svt-step-n\">2<\/span><strong>Draft design<\/strong><span class=\"svt-step-tx\"><a href=\"\/basic-engineering\/?lang=en\">Basic engineering<\/a> with process design (planning phase 2).<\/span><\/li><li><span class=\"svt-step-n\">3<\/span><strong>FEED &amp; tender<\/strong><span class=\"svt-step-tx\">Tender documents, <a href=\"\/software-interface-description\/?lang=en\">interface definitions<\/a> and the specification for approval (phase 3).<\/span><\/li><li><span class=\"svt-step-n\">4<\/span><strong>Detail engineering<\/strong><span class=\"svt-step-tx\"><a href=\"\/procurement-support\/?lang=en\">Enquiry and procurement<\/a>.<\/span><\/li><li><span class=\"svt-step-n\">5<\/span><strong>Functional specification<\/strong><span class=\"svt-step-tx\">The contractor prepares it based on the approved tender documents.<\/span><\/li><li><span class=\"svt-step-n\">6<\/span><strong>Construction supervision<\/strong><span class=\"svt-step-tx\"><a href=\"\/construction-supervision\/?lang=en\">Supervision of the construction phase<\/a> at the supplier; the client approves the quality documents.<\/span><\/li><li><span class=\"svt-step-n\">7<\/span><strong>FAT<\/strong><span class=\"svt-step-tx\">Factory Acceptance Test \u2013 acceptance at the supplier\u2019s works.<\/span><\/li><li><span class=\"svt-step-n\">8<\/span><strong>Installation &amp; commissioning<\/strong><span class=\"svt-step-tx\">Installation and commissioning of the plant on site.<\/span><\/li><li><span class=\"svt-step-n\">9<\/span><strong>IQ<\/strong><span class=\"svt-step-tx\"><a href=\"\/installation-qualification\/?lang=en\">Installation qualification<\/a>: verification against the order documents.<\/span><\/li><li><span class=\"svt-step-n\">10<\/span><strong>OQ<\/strong><span class=\"svt-step-tx\"><a href=\"\/operational-qualification\/?lang=en\">Operational qualification<\/a>: verification of the intended functionality.<\/span><\/li><li><span class=\"svt-step-n\">11<\/span><strong>PQ<\/strong><span class=\"svt-step-tx\"><a href=\"\/process-qualification\/?lang=en\">Performance qualification<\/a>: proof of the required performance.<\/span><\/li><li><span class=\"svt-step-n\">12<\/span><strong>SAT<\/strong><span class=\"svt-step-tx\">Site Acceptance Test \u2013 acceptance at the customer\u2019s site.<\/span><\/li><\/ol><p><strong>SEEFRIED Verfahrenstechnik GmbH<\/strong> prepares this specification for your process requirements \u2013 optionally including the associated <a href=\"\/software-interface-description\/?lang=en\">interface descriptions<\/a>.<\/p><h2>Frequently Asked Questions about requirement specifications for process plants<\/h2><h3>What is a requirement specification?<\/h3><p>The requirement specification (user requirement specification) describes all of the customer\u2019s requirements for the contractor\u2019s deliveries and services. It is the basis for tendering, offer comparison and the supplier\u2019s functional specification.<\/p><h3>What is the difference between a requirement specification and a functional specification?<\/h3><p>The requirement specification defines what the customer requires. The functional specification is prepared by the contractor based on the approved tender documents and describes how the requirements will be met.<\/p><h3>Which phases should a requirement specification cover?<\/h3><p>From defining the basic parameters through basic engineering, FEED, detail engineering and procurement to construction supervision, FAT, installation, qualification (IQ, OQ, PQ) and SAT at the customer\u2019s site.<\/p><h3>Which standards are relevant?<\/h3><p>Depending on the project, for example GMP and GAMP as well as the respective environmental conditions. They must be clarified before tendering.<\/p><h2 class=\"svt-pcta-h\">Talk to us<\/h2><div class=\"svt-pcta svt-pcta-m\"><div class=\"svt-pcta-tx\">We are happy to advise you on requirement specifications for process plants \u2013 by phone at <a href=\"tel:+494203789492\">+49 4203 789492<\/a> or by e-mail at <a href=\"mailto:inf&#111;&#64;s-v&#116;.n&#101;t\">&#105;&#110;&#102;&#111;&#64;s&#45;v&#116;&#46;&#110;&#101;&#116;<\/a>.<\/div><div class=\"svt-pcta-btns\"><a class=\"svt-btn svt-btn-primary\" href=\"\/contact\/?lang=en&amp;produkt=Verfahrenstechnische%20Beratung\">Send an enquiry<\/a><a class=\"svt-btn svt-btn-ghost\" href=\"\/planning\/?lang=en\">All services<\/a><\/div><\/div><h2>More services<\/h2><div class=\"svt-sgrid\"><a class=\"svt-scard\" href=\"\/planning\/?lang=en\"><span>Planning<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/basic-engineering\/?lang=en\"><span>Basic engineering<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/design-construction-support\/?lang=en\"><span>Design &amp; construction support<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/procurement-support\/?lang=en\"><span>Procurement support<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/schedule-planning\/?lang=en\"><span>Schedule planning &amp; monitoring<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/construction-supervision\/?lang=en\"><span>Construction supervision<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/design-qualification\/?lang=en\"><span>DQ \u2013 Design qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/installation-qualification\/?lang=en\"><span>IQ \u2013 Installation qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/operational-qualification\/?lang=en\"><span>OQ \u2013 Operational qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-qualification\/?lang=en\"><span>PQ \u2013 Process qualification<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><a class=\"svt-scard\" href=\"\/process-optimisation\/?lang=en\"><span>Process optimisation<\/span><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><\/a><\/div><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Service\",\"name\":\"Preparation of requirement specifications for process plants\",\"description\":\"Preparation of requirement specifications and tender documents for process engineering plants including interface descriptions, FAT\/SAT and qualification.\",\"url\":\"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en\",\"provider\":{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.s-vt.net\/#seefried\",\"name\":\"SEEFRIED Verfahrenstechnik GmbH\",\"url\":\"https:\/\/www.s-vt.net\/\",\"telephone\":\"+49 4203 789492\"},\"areaServed\":\"Worldwide\"},{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is a requirement specification?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The requirement specification (user requirement specification) describes all of the customer\u2019s requirements for the contractor\u2019s deliveries and services. It is the basis for tendering, offer comparison and the supplier\u2019s functional specification.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between a requirement specification and a functional specification?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The requirement specification defines what the customer requires. The functional specification is prepared by the contractor based on the approved tender documents and describes how the requirements will be met.\"}},{\"@type\":\"Question\",\"name\":\"Which phases should a requirement specification cover?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"From defining the basic parameters through basic engineering, FEED, detail engineering and procurement to construction supervision, FAT, installation, qualification (IQ, OQ, PQ) and SAT at the customer\u2019s site.\"}},{\"@type\":\"Question\",\"name\":\"Which standards are relevant?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Depending on the project, for example GMP and GAMP as well as the respective environmental conditions. They must be clarified before tendering.\"}}]}]}<\/script><\/div><\/div><\/div><\/section><\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"class_list":["post-4035","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Requirement Specification for Process Plants | SEEFRIED<\/title>\n<meta name=\"description\" content=\"Requirement specification for process plants: basic parameters, basic engineering, FEED, procurement, FAT, IQ\/OQ\/PQ and SAT \u2013 we prepare your URS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Requirement Specification for Process Plants | SEEFRIED\" \/>\n<meta property=\"og:description\" content=\"Requirement specification for process plants: basic parameters, basic engineering, FEED, procurement, FAT, IQ\/OQ\/PQ and SAT \u2013 we prepare your URS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en\" \/>\n<meta property=\"og:site_name\" content=\"SEEFRIED Verfahrenstechnik GmbH\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T11:06:15+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/process-plants-requirement-specifications\\\/?lang=en\",\"url\":\"https:\\\/\\\/www.s-vt.net\\\/process-plants-requirement-specifications\\\/?lang=en\",\"name\":\"Requirement Specification for Process Plants | SEEFRIED\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/#website\"},\"datePublished\":\"2015-04-08T10:26:58+00:00\",\"dateModified\":\"2026-10-26T11:06:15+00:00\",\"description\":\"Requirement specification for process plants: basic parameters, basic engineering, FEED, procurement, FAT, IQ\\\/OQ\\\/PQ and SAT \u2013 we prepare your URS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/process-plants-requirement-specifications\\\/?lang=en#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.s-vt.net\\\/process-plants-requirement-specifications\\\/?lang=en\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/process-plants-requirement-specifications\\\/?lang=en#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.s-vt.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Requirement Specifications for Process Plants\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.s-vt.net\\\/#website\",\"url\":\"https:\\\/\\\/www.s-vt.net\\\/\",\"name\":\"SEEFRIED Verfahrenstechnik GmbH\",\"description\":\"Misch- und Verfahrenstechnik von Experten\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.s-vt.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Requirement Specification for Process Plants | SEEFRIED","description":"Requirement specification for process plants: basic parameters, basic engineering, FEED, procurement, FAT, IQ\/OQ\/PQ and SAT \u2013 we prepare your URS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en","og_locale":"en_US","og_type":"article","og_title":"Requirement Specification for Process Plants | SEEFRIED","og_description":"Requirement specification for process plants: basic parameters, basic engineering, FEED, procurement, FAT, IQ\/OQ\/PQ and SAT \u2013 we prepare your URS.","og_url":"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en","og_site_name":"SEEFRIED Verfahrenstechnik GmbH","article_modified_time":"2026-10-26T11:06:15+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en","url":"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en","name":"Requirement Specification for Process Plants | SEEFRIED","isPartOf":{"@id":"https:\/\/www.s-vt.net\/#website"},"datePublished":"2015-04-08T10:26:58+00:00","dateModified":"2026-10-26T11:06:15+00:00","description":"Requirement specification for process plants: basic parameters, basic engineering, FEED, procurement, FAT, IQ\/OQ\/PQ and SAT \u2013 we prepare your URS.","breadcrumb":{"@id":"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.s-vt.net\/process-plants-requirement-specifications\/?lang=en#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.s-vt.net\/en\/"},{"@type":"ListItem","position":2,"name":"Requirement Specifications for Process Plants"}]},{"@type":"WebSite","@id":"https:\/\/www.s-vt.net\/#website","url":"https:\/\/www.s-vt.net\/","name":"SEEFRIED Verfahrenstechnik GmbH","description":"Misch- und Verfahrenstechnik von Experten","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.s-vt.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/comments?post=4035"}],"version-history":[{"count":3,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4035\/revisions"}],"predecessor-version":[{"id":5998,"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/pages\/4035\/revisions\/5998"}],"wp:attachment":[{"href":"https:\/\/www.s-vt.net\/en\/wp-json\/wp\/v2\/media?parent=4035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}